| SERVICES |
- We will provide equipment, plant and material in good condition on site.
- The equipment sent to site will be pre-checked at our premises/workshop and will be tested on site (pump) prior to commencement of our works in full swing.
- There will be periodic maintenance of all our equipment on site to ensure uninterrupted and efficient working of our system.
- We will maintain the draw down of groundwater at - 0.50m below the maximum level of excavation as mentioned in the method statement.
- We will provide mobile telephone and pager numbers of all personnel relevant to the site In order to attend any site emergencies
- If there are any requirements from the Contractors Quality Plan that will help us work more efficiently on site, we will look in to the details of any such suggestion and try to implement them immediately.
List of Plant & Machinery in the fleet.
|
Sl.No. |
Name of Machineries |
Quantity |
1 |
Miller 6" diameter Dewatering Pumps |
1 No. |
2 |
6" diameter Dewatering Pumps |
110 Nos. |
3 |
Jetting Pump for Installation of wellpoints |
3 Nos. |
4 |
Header Pipes 6" diameter, 6 Meter Long |
900 Nos. |
5 |
Total length of Discharge Hose 6" dia |
10,000 Mtrs. |
6 |
Suction hose, 6" diameter |
110 Mtrs |
7 |
Total Number of Wellpoints, 6 meter long |
5,000 Nos. |
8 |
Total Number of Swing Hose [1 meter long] |
5,000 Nos. |
9 |
3 Ton Pick-up |
3 Nos. |
10 |
4 Wheel Jeep & Cars |
5 Nos. |
|
| |
|
 |
|